| 25KL MSRL Reactors - 13 nos |
 |
| 50 KL MSRL Reactors - 16 nos |
| Ball Mill with total Capacity 120 MTPD - 2 nos |
| 6 KL MSRL filtration Vessels - 3 nos |
| 48" x 100 plates PP Filters Press - 38 nos |
| Jacketed Furnace for Copper smelting - 2 nos |
| 2000 litres PPFRP Electro Wining Cells - 110 nos |
| 3000 AMP / 100 Volts Rectifier - 3 nos |
| Peripheral Equipments, Pipings, Electricals, storage tanks etc |
| |
|
| In addition, following Utilities are in existence |
| |
| Power Connection from SNEL |
| Standby - DG Sets 3 Nos 400 KVA each. |
| Air Compressors 60 CMF X 8 Nos |
| Forklifts - 15 Nos |
| Bore well - 3 Nos |
Light / Heavy Vehicles – 30 nos |
| |
| Nominal capacity of the plant is as follows : |
| |
| Cobalt Hydroxide -180 MT per month |
| Copper Cathode - 400 MT per month |
| Copper Powder – Grade A - 50 MT per month |
| Copper Powder – Grade B - 50 MT per month |
| Copper Granules - 200 MT per month |
| Copper Blisters - 100 MT per month |
| |
| Quality Control Facility |
Apart from all routine equipments, Somika maintains three sets of Perkin Elmer Make Atomic Absorption Spectrophotometers, 3 sets of XRF Niton Equipments and 4 sets of Geiger Counter to monitor radiation in different material received for processing. The facility is operational round the clock and is managed by qualified and experienced professionals.
|
| Branches |
|
The Company has branches in Kolwezi and Likasi for collection, analysis, crushing and packing of Minerals. These areas have high availability of rich minerals.
At Likasi, the company owns a land and has a constructed a Depot of its own for collection of ores from nearby areas.
Recently, Mining activity has started at Kabolela on a large scale with intensive Mechanization and this shall be the thrust area of Mining Operations for coming years.
|
| Major Assets |
 |
| Copper plant |
| Water jacket furnace – 3 nos |
| Bucket elevator |
| Cooling System |
| Conveyer System |
| |
| |